# Adif Executives Secured Bonus Plan Before President's Resignation

Outgoing leadership approved long-term incentive contracts just hours before a major management shakeup.

- **Source:** [El Mundo – Portada](https://www.elmundo.es)
- **Published:** 2026-11-06
- **Topic:** [Business](https://brifing.si/c/business)
- **Original article:** <https://www.elmundo.es/economia/2026/11/06/6aee494321efa0477c8b45b8.html>
- **On Brifing:** https://brifing.si/s/5db21bce-cc0c-4333-8aad-cb4da2fabd8f

## Controversial Bonus Approval

Adif, the Spanish public railway manager, renewed its executive incentive plan on November 3, 2026. The agreement, signed by outgoing president Pedro Marco de la Peña, covers the period between 2026 and 2030. This decision occurred just hours before a significant leadership transition within the Ministry of Transport and the company.

## Context of Resignations

The approval followed the surprise resignation of Transport Minister Óscar Puente. Pedro Marco de la Peña, who had been under intense scrutiny due to a series of fatal railway accidents in Adamuz and Urda, subsequently resigned. These events marked a period of extreme instability for the state-owned railway infrastructure operator.

## Scope of Compensation

The incentive plan targets the executive committee, including the president, cabinet director, and various general managers. In 2025, this committee received a total remuneration of 1.2 million euros. The new agreement ensures continuity for these variable pay structures, which are tied to operational results, investment targets, and service performance metrics.

## Performance Metric Omissions

While the bonus structure includes ESG criteria like energy transition and sustainable finance, it notably excludes safety and punctuality indicators. Despite 2026 being described as the worst year in recent railway history, the variable pay remains linked to financial and operational goals rather than the immediate safety of the rail network.

## Financial Agreement Structure

The approved convention regulates state budget contributions, deficit compensation, and debt control for Adif. It replaces the previous agreement that expired in 2025. The document serves as a formal contract between the public entity and the Ministry of Finance, defining the investment plans and service quality levels expected until 2030.

## Grim Operational Forecasts

The new agreement projects a challenging outlook for the next four years. Adif expects to consistently miss its preventive maintenance targets for both conventional and high-speed lines. Even with increased funding, the maximum compliance rate for maintenance is projected at 96% for high-speed rail, signaling ongoing infrastructure reliability concerns.

## Punctuality and Maintenance Issues

Railway punctuality issues tripled during 2026, reaching historic lows. Although the new plan aims for some improvement, it does not anticipate returning to previous performance standards. The document explicitly acknowledges that maintenance goals will not be fully met, reflecting systemic difficulties in managing the expanding high-speed network effectively.

## Political and Public Impact

The timing of the bonus approval has sparked criticism regarding governance and political appointments within Adif. With 116 deaths recorded in accidents over nine months, the focus on executive incentives rather than service recovery highlights a disconnect between management rewards and the deteriorating performance of the national rail system.

## Sources covering this story

- https://www.elmundo.es/economia/2026/11/06/6aee494321efa0477c8b45b8.html — 

---

_Summary written by Brifing from the original reporting. Copyright in the original article belongs to its publisher; read the full piece at the link above._
