# Coliseum Place Affordable Housing Project in Oakland

A six-level residential development providing fifty-nine affordable homes for low-income families.

- **Source:** [ArchDaily Global](https://brifing.si/source/b856ce4a-b51b-4705-954b-40620e034caa)
- **Published:** 2026-10-28
- **Topic:** [Business](https://brifing.si/c/business)
- **Original article:** <https://www.archdaily.com/1024398/coliseum-place-building-david-baker-architects>
- **On Brifing:** https://brifing.si/s/5e104c16-416a-41ad-ae70-c75cd55f330c

## Project Scope and Scale

The Coliseum Place project in Oakland spans a total area of 79,752 square feet. Completed in 2022, this six-level residential building serves as a critical infrastructure development. It provides 59 affordable housing units specifically designed to support low-income and formerly unhoused families, integrating essential living spaces within the urban fabric of the city.

## Strategic Social Integration

Beyond residential capacity, the facility incorporates dedicated social services for its residents. This model assists households receiving support through the Oakland Housing Authority, ensuring that housing is paired with necessary community resources. By combining shelter with social infrastructure, the project addresses the multifaceted needs of vulnerable populations within the local Oakland community.

## Architectural Design Team

David Baker Architects led the design process for this residential development. The core team included Katie Ackerly, Daniel Simons, Chelsea Johnson, and Billy Forrest. Their collaborative approach ensured that the structural requirements met the specific needs of the residents while maintaining the functional standards required for a high-density, six-level affordable housing complex.

## Engineering and Construction Partners

Nibbi Brothers General Contractors served as the general contractor for the construction phase. KPFF Engineers provided the structural and civil engineering expertise necessary for the building's foundation and frame. EDesignC managed the MEP and lighting systems, ensuring that the technical infrastructure supports the long-term operational efficiency of the residential facility in Oakland.

## Material and Landscape Specifications

The construction utilized steel and concrete as primary structural materials to ensure durability. Form/Work Landscape Architecture designed the surrounding outdoor spaces to complement the residential structure. Interior and exterior finishes feature products from manufacturers including Daltile, Interface, Sherwin-Williams, Advanta, Armstrong, and Mecho, reflecting a commitment to quality materials in affordable housing projects.

## Urban Development Context

Located in the United States, this project highlights the role of private-public partnerships in urban housing. Resources for Community Development acted as the developer, facilitating the delivery of these homes. The project demonstrates how architectural firms can effectively utilize limited urban footprints to maximize the delivery of essential social housing units.

## Operational Impact Analysis

The building functions as more than just a residential structure; it acts as a hub for social stability. By targeting families gaining assistance through the Oakland Housing Authority, the development creates a sustainable pathway for residents. The integration of social services directly into the housing site reduces barriers for families seeking long-term stability.

## Architectural Legacy and Future

Coliseum Place serves as a benchmark for modern affordable housing design in high-cost urban environments. By prioritizing both structural integrity and social service accessibility, the project showcases a scalable model for future developments. The 2022 completion marks a significant contribution to Oakland's ongoing efforts to mitigate the regional housing crisis effectively.

## Sources covering this story

- https://www.archdaily.com/1024398/coliseum-place-building-david-baker-architects — 

---

_Summary written by Brifing from the original reporting. Copyright in the original article belongs to its publisher; read the full piece at the link above._
