# Demolition of Studio Fuksas Concert Hall Begins in Tbilisi

The building designed by Italian architecture firm Studio Fuksas is being demolished without ever opening.

- **Source:** [Architecture news and projects | Dezeen](https://brifing.si/source/50c21201-9cc6-48e0-8a7c-6ea605af10c3)
- **Published:** 2026-08-03
- **Topic:** [Business](https://brifing.si/c/business)
- **Original article:** <https://www.dezeen.com/2026/08/03/rike-concert-hall-demolition-tbilisi-studio-fuksas/>
- **On Brifing:** https://brifing.si/s/6824d3e7-41a0-4000-ac17-eb9e61bba0d1

## Demolition Process Begins

The demolition of the Rike Concert Hall in Tbilisi has begun. Designed by Italian architecture firm Studio Fuksas, the building is being demolished without ever opening. The demolition permit was issued by the Tbilisi City Hall Architecture Department two weeks ago. The process started with the removal of the building's exterior cladding, which was captured on video by TV Pirveli.

## History of the Building

The Rike Concert Hall was built in 2012 as part of a city revitalization plan under former President Mikheil Saakashvili. Although the construction was largely completed, the building never opened to the public. The change of government in 2012 is seen as the main reason for the project's abandonment. The building was sold to a property developer in 2022 and transferred to Makro Constructions in 2025.

## Architectural Features

The Rike Concert Hall consists of two tube-shaped structures opening onto the riverside park. The exterior was covered with square stainless steel panels resembling scales. Studio Fuksas' design made the building highly distinctive. During the demolition process, these panels were removed, exposing the building's internal structure.

## Cultural Loss

Studio Fuksas described the demolition as a 'significant cultural setback.' The architecture firm attempted to contact local authorities to propose alternative solutions for preserving and repurposing the building. However, these proposals received no response. Studio Fuksas emphasized that the demolition is a premature and irreversible decision.

## Political Context

The abandonment and demolition of the Rike Concert Hall are closely linked to the political changes in Georgia. The building's association with the previous government led the new administration to withdraw support for the project. This resulted in the building remaining closed for years and eventually being slated for demolition.

## Role of Property Developers

The building was sold to a property developer in 2022 and transferred to Makro Constructions in 2025. The new owners decided to demolish the building rather than preserve it. This decision sparked debates in architectural and cultural circles. Despite Studio Fuksas' efforts to repurpose the building, no agreement was reached.

## Impact of the Demolition

The demolition of the Rike Concert Hall is considered a significant loss for Tbilisi's cultural heritage. The building's distinctive architecture and location made it an important landmark. The demolition decision has sparked widespread debate and criticism in architectural and cultural communities.

## Lessons for the Future

The demolition of the Rike Concert Hall serves as an important lesson in the preservation of historical and cultural heritage. More effective policies are needed to protect and repurpose such structures. Despite Studio Fuksas' efforts, the lack of response highlights the shortcomings in this area.

## Sources covering this story

- https://www.dezeen.com/2026/08/03/rike-concert-hall-demolition-tbilisi-studio-fuksas/ — 

---

_Summary written by Brifing from the original reporting. Copyright in the original article belongs to its publisher; read the full piece at the link above._
