# Qantas Trains 1,560 Crew Members for Ultra-Long-Haul Airbus A350 Operations

The airline prepares for 22-hour nonstop flights requiring massive crew redundancy and specialized training.

- **Source:** [Simple Flying](https://simpleflying.com)
- **Published:** 2026-11-07
- **Topic:** [Business](https://brifing.si/c/business)
- **Original article:** <https://simpleflying.com/qantas-training-360-pilots-1200-cabin-crew-12-airbus-a350-1000ulrs/>
- **On Brifing:** https://brifing.si/s/7052896c-3929-486a-9e0d-82fc2dfcf997

## Massive Workforce Expansion

Qantas is preparing to train over 360 pilots and 1,200 cabin crew members to support its upcoming fleet of 12 Airbus A350-1000ULR aircraft. This workforce, totaling 1,560 personnel, is specifically allocated to manage the rigorous demands of Project Sunrise, which aims to connect Australia to London and New York via nonstop flights.

## Operational Crew Ratios

The airline requires 30 pilots and 100 cabin crew per airframe, effectively doubling the staffing levels of conventional long-haul aircraft. This high ratio is necessary to accommodate the 22-hour flight duration, which mandates extended rest periods for crew members and exceeds standard duty limits currently applied to shorter international aviation sectors.

## Technical Flight Requirements

Each A350-1000ULR features an additional 20,000-liter rear center fuel tank, enabling nonstop travel exceeding 16,000 kilometers. This specialized engineering allows the aircraft to maintain flight for up to 22 hours. Consequently, the crew complement is driven by these specific mission parameters rather than the physical size of the aircraft fleet.

## Training Infrastructure Strategy

Training is currently underway using Australia's first A350 simulator located in Sydney. Additionally, Qantas has partnered with British Airways in the United Kingdom to utilize their existing A350 expertise. This dual-track approach allows the airline to build necessary pilot competency well before the first aircraft delivery scheduled for April 2027.

## Internal Talent Transition

The initial training cohort is drawn from the airline's existing A330 pilot pool. Currently, 40 pilots are undergoing conversion training for the A350 while simultaneously maintaining their active flight duties on the A330 fleet. This strategy ensures a smooth transition of experienced personnel into the new ultra-long-range operational model for the airline.

## Regulatory Fatigue Management

Qantas has collaborated with the Civil Aviation Safety Authority to establish new fatigue management protocols for these extended sectors. Because standard duty limits do not apply to flights exceeding 20 hours, these bespoke arrangements are critical. The exact details of these duty periods remain undisclosed but reflect the unique operational challenges.

## Project Sunrise Timeline

The first aircraft delivery is set for April 2027, with the Sydney to London route launching in October 2027. Sydney to New York service is expected to follow by mid-2028. The airline plans to use the initial months post-delivery for crew familiarization flights, likely operating short-haul sectors to New Zealand first.

## Strategic Fleet Evolution

Project Sunrise represents a broader transition for Qantas, shifting from a Boeing-heavy long-haul fleet to an Airbus-based structure. By integrating these ultra-long-haul routes as a core network component rather than exceptions, the airline is fundamentally changing its crew rostering and long-term operational strategy for the next decade of global connectivity.

## Sources covering this story

- https://simpleflying.com/qantas-training-360-pilots-1200-cabin-crew-12-airbus-a350-1000ulrs/ — 

---

_Summary written by Brifing from the original reporting. Copyright in the original article belongs to its publisher; read the full piece at the link above._
