# L&T Secures Noida Metro Aqua Line Extension Contract

Larsen & Toubro will construct ten elevated stations and a 15.1-km viaduct.

- **Source:** [mint - industry](https://www.livemint.com/rss/industry)
- **Published:** 2026-11-09
- **Topic:** [Business](https://brifing.si/c/business)
- **Original article:** <https://www.livemint.com/industry/infrastructure/lt-bags-noida-metro-rail-order-for-aqua-line-10-elevated-stations-botanical-garden-sec-142-depot-boraki-ke-11794223765121.html>
- **On Brifing:** https://brifing.si/s/d31b5d10-14f9-4ffd-8da9-fc9f295db5a8

## Contract Award Details

Larsen & Toubro has secured a major contract from the Noida Metro Rail Corporation for the Aqua Line extension. The project, valued between 1,000 crore and 2,500 crore rupees, falls under the company's Heavy Civil Infrastructure vertical. This development marks a significant expansion of the existing metro network in the region.

## Scope of Construction

The project involves designing and building a 15.1-km elevated metro viaduct across two specific stretches. These include the routes from Botanical Garden to Noida Sector 142 and from Depot Station to Boraki. Additionally, the scope encompasses the construction of 10 elevated metro stations, including all necessary architectural finishing works for completion.

## Project Timeline Expectations

Larsen & Toubro has committed to a stringent 36-month timeline for the completion of this infrastructure project. The extension aims to improve regional connectivity across Noida and Greater Noida, supporting the area's rapid urban and economic growth. This timeline is critical for meeting the rising demand for mass rapid transit systems.

## Rising Passenger Demand

The expansion follows a period of increased ridership on the existing Aqua Line network. On October 23, the Noida Metro Rail Corporation recorded its highest-ever single-day ridership of 1.05 lakh passengers. Average daily footfall has also grown by 20 percent, driven by various initiatives aimed at improving overall commuter convenience and accessibility.

## Operational Enhancements

To manage increasing demand, the corporation is implementing several operational changes. Starting November 1, peak hour train frequency will improve, reducing intervals from seven minutes and 30 seconds to six minutes and 35 seconds. These measures, alongside QR-based ticketing and the National Common Mobility Card, are designed to streamline the passenger experience.

## Future Service Proposals

Beyond infrastructure construction, the corporation is evaluating the feasibility of extending late-night metro services. A proposal suggests the last train from Noida Sector 51 towards Depot Station could depart at 11:25 PM. Final implementation remains subject to operational feasibility studies and the successful coordination of arrangements with all relevant project stakeholders.

## Strategic Network Connectivity

The current Aqua Line operates between Noida Sector 51 and Depot Station in Greater Noida. Notably, Sector 51 maintains a connection to the Delhi Metro Blue Line at Sector 52 via a skywalk. The new expansion will further strengthen this network, integrating emerging residential and commercial areas into the broader transit system.

## Corporate Market Position

Larsen & Toubro, a 32-billion dollar Indian multinational, continues to leverage its expertise in engineering, procurement, and construction. By undertaking this metro project, the company reinforces its role in India's urban infrastructure development. This contract highlights the ongoing trend of large-scale investment in public transport to support expanding metropolitan landscapes.

## Sources covering this story

- https://www.livemint.com/industry/infrastructure/lt-bags-noida-metro-rail-order-for-aqua-line-10-elevated-stations-botanical-garden-sec-142-depot-boraki-ke-11794223765121.html — 

---

_Summary written by Brifing from the original reporting. Copyright in the original article belongs to its publisher; read the full piece at the link above._
